DESAIN JALAN RAYA PALEMBANG-BETUNG KM. 61+500-KM. 67+216 PROVINSI SUMATERA SELATAN

CAHYA, IMAM DWI and RAMADHAN, MUHAMMAD FAHJRI (2016) DESAIN JALAN RAYA PALEMBANG-BETUNG KM. 61+500-KM. 67+216 PROVINSI SUMATERA SELATAN. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.

[img]
Preview
Text
COVER.pdf

Download (451kB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (207kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (2MB) | Preview
[img] Text (BAB III Perhitungan Konstruksi)
BAB III.pdf
Restricted to Repository staff only

Download (2MB)
[img] Text (BAB IV Manajemen Proyek)
BAB IV.pdf
Restricted to Repository staff only

Download (1MB)
[img]
Preview
Text
BAB V.pdf

Download (118kB) | Preview
[img]
Preview
Text
DAFTAR PUSTAKA.pdf

Download (184kB) | Preview

Abstract

Palembang-Betung highway is the road that connects the region in southern Sumatra particularly between Palembang, Betung, Jambi and Sekayu.This road has an important role improving the grewth of economy around the region, and also improving people’s life prosperous in all of the aspect. In this design did a calculation to get a good design so that this street could give the user safe, comfortable, and economic.In the planning of geometric design, the design got from many references such as calculation of horizontal alignment, vertical alignment, classify of road, and deciding the pavement. Based on the calculation, Palembang–Betung road was the road that classify I with the speed plan was 80 km/jam, there are 4 lane 2 direction divided with the width of each lane was 3,5 m per lane and the width of shoulder was 2,5 m. In this road used 7 curve, The surface layer of the street used Asphalt Concrete-Wearing Course where the thickness was 4 cm, Asphalt Concrete-Base Course where the thickness was 13,5 cm, the top pondation layer used Cement Treated Base with the the thickness was 13,5 cm, and the low pondation layer used stone classify A with the thickness was 15 cm. The total cost of this project was Rp. 74.170.237.700,00(Seventy Four Billion One Hundred and Seventy Million Two Hundred and Thirty Seven Thousand and Seven Hundred Rupiah) and need 191 days work for implementation.

Item Type: Thesis (Other)
Uncontrolled Keywords: Perhitungan alinyemen horizontal, Alinyemen vertikal, Kelas jalan
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 13 Oct 2017 01:56
Last Modified: 13 Oct 2017 01:56
URI: http://eprints.polsri.ac.id/id/eprint/4131

Actions (login required)

View Item View Item