EVALUASI RELAY OVER CURRENT RELAY (OCR) DAN GROUND FAULT RELAY (GFR) PADA GI GANDUS MENGGUNAKAN SOFTWARE ETAP 12.6.0

BIMANTARA, ROBBY (2017) EVALUASI RELAY OVER CURRENT RELAY (OCR) DAN GROUND FAULT RELAY (GFR) PADA GI GANDUS MENGGUNAKAN SOFTWARE ETAP 12.6.0. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.

[img]
Preview
Text (Cover)
File 1.pdf

Download (515kB) | Preview
[img]
Preview
Text (BAB I Pendahuluan)
File 2.pdf

Download (148kB) | Preview
[img]
Preview
Text (BAB II Tinjauan Pustaka)
File 3.pdf

Download (615kB) | Preview
[img] Text (BAB III Metode Penelitian)
File 4.pdf
Restricted to Repository staff only

Download (470kB) | Request a copy
[img] Text (BAB IV Pembahasan)
File 5.pdf
Restricted to Repository staff only

Download (764kB) | Request a copy
[img]
Preview
Text (BAB V Kesimpulan dan Saran)
File 6.pdf

Download (213kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
File 7.pdf

Download (4kB) | Preview

Abstract

In electrical system there are always a protection system to anticipate unexpected circumstances when fault is occured in a system. This protection systems are necessary to separate a trouble part with a normal part to make sure that the system can operate as normally.Over current relay and ground fault relay are works by monitoring the amount of current that is contained in the conductor, when the amount of current is exceeds the adjusment of relay, and then relay will work to instructs Circuit Breaker to break distribution system. One of the trouble that cause an increases in electric current is short circuit fault that makes a current which flow on a conductor is exceeds maximum value of the conductor or electrical equipments. So that, the author is discuss setting of over current relay and ground fault relay and also to make a simulation of “coordination over current relay and ground fault relay” on ETAP 12.6.0 program. This program is purpose to design an electrical systemand simulate it. Is it in accordance with the actual setting

Item Type: Thesis (Other)
Uncontrolled Keywords: Rele proteksi, rele Arus Lebih, rele Gangguan tanah, penyetelan arus dan waktu rele , simulasi pada program ETAP 12.6.0
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Electrical Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 16 Apr 2018 01:31
Last Modified: 16 Apr 2018 01:31
URI: http://eprints.polsri.ac.id/id/eprint/4433

Actions (login required)

View Item View Item