GUMILAR, BAYU RAKA (2017) RANCANG BANGUN ALAT MONITORING ARUS 3 PHASA PADA TRAFO DAYA. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.
Full text not available from this repository. (Request a copy)Abstract
In this case a fully reliable transformer (if the bias continues without stopping). Given the hard work of such a transformer, the withdrawal method is also required as best as possible. Therefore the transformer must be maintained by using the correct and proper system and equipment. Based on its operating capacity can be divided into 500/150 kV and 150/70 kV tranformator commonly called Interbus Transformer (IBT). 150/20 kV and 70/20 kV transformers are also called distribution transformers. Often this happens to the transformer this is caused many factors to determine the cause must be done in the analysis of the parameters at the time occurred. This is accomplished by transforming the transformer monitor tool by coupling the Dummy load, ACS 712 Flow Sensor, Arduino Uno, LCD. From the results of the monitoring tool design can be seen the cause of travel on the phases and the amount of more current flowing through the phase and can facilitate analyze the cause of the disturbance in the transformer.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Dummy load, Arduino Uno, Sensor Arus ACS 712, LCD |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Divisions: | Electrical Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 19 Apr 2018 10:13 |
Last Modified: | 19 Apr 2018 10:13 |
URI: | http://eprints.polsri.ac.id/id/eprint/4458 |
Actions (login required)
![]() |
View Item |