PERENCANAAN JALAN AKSES BATUBARA KABUPATEN LAHAT PADA STA 0+000 - STA 5+000

SANTOSO, TRI BUDI and AISYAH, - (2014) PERENCANAAN JALAN AKSES BATUBARA KABUPATEN LAHAT PADA STA 0+000 - STA 5+000. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (Cover)
COVER.pdf

Download (273kB) | Preview
[img]
Preview
Text (BAB 1 PENDAHULUAN)
bab 1.pdf

Download (140kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
bab 2.pdf

Download (1MB) | Preview
[img] Text (BAB III PERHITUNGAN PERENCANAAN JALAN)
bab 3.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB IV PENGELOLAAN PROYEK)
bab 4.pdf
Restricted to Repository staff only

Download (1MB)
[img]
Preview
Text (BAB V PENUTUP)
BAB 5.pdf

Download (147kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (49kB) | Preview

Abstract

Acces of Batubara street in Lahat is a road that connects the cast and cross the middle Lahat, this road has a very important role in promoting economic growth both locally and nationally. The final report this writing, the autbor would like to know how the planning and design of geometric and hard compact on acces of batubara street in Lahat, so that the road will be able to give a sense of security, convenient, and economical way for the user. In order to design this geometric road, we use some methods, they are Bina Marga’s standard specification method, and Component Analysis Method for planning flexible pavement, and cost plan, and Project Management, and Cross Town Geometric Road Rules ( No.38/TBM,1997 ). From the result od above calculations, so Acces of Batubara street in Lahat is a class I road according to LHR value within >10000 smp/day/ 2 ways with the speed of the road plan 20-60 km/hour, and this road use 28 curves and value of California Bearing Ratio is 3,9% for surface area hard compact thickness are (4cm for ACWC, 6 cm for ACBC, 8 cm for AC base) used asphalt concrete, sub base is 25 cm used split class A and base is 30 cm used agregate class B. This road building was carried out within 116 days with a total fund Rp 24.784.700.000,-

Item Type: Thesis (Other)
Uncontrolled Keywords: This road building was carried out within 116 days with a total fund Rp 24.784.700.000,-
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mr Bambang Anthony
Date Deposited: 01 Dec 2015 01:53
Last Modified: 01 Dec 2015 01:53
URI: http://eprints.polsri.ac.id/id/eprint/1323

Actions (login required)

View Item View Item