SANTOSO, TRI BUDI and AISYAH, - (2014) PERENCANAAN JALAN AKSES BATUBARA KABUPATEN LAHAT PADA STA 0+000 - STA 5+000. Other thesis, Politeknik Negeri Sriwijaya.
|
Text (Cover)
COVER.pdf Download (273kB) | Preview |
|
|
Text (BAB 1 PENDAHULUAN)
bab 1.pdf Download (140kB) | Preview |
|
![]()
|
Text (BAB II TINJAUAN PUSTAKA)
bab 2.pdf Download (1MB) | Preview |
|
![]() |
Text (BAB III PERHITUNGAN PERENCANAAN JALAN)
bab 3.pdf Restricted to Repository staff only Download (1MB) |
|
![]() |
Text (BAB IV PENGELOLAAN PROYEK)
bab 4.pdf Restricted to Repository staff only Download (1MB) |
|
|
Text (BAB V PENUTUP)
BAB 5.pdf Download (147kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf Download (49kB) | Preview |
Abstract
Acces of Batubara street in Lahat is a road that connects the cast and cross the middle Lahat, this road has a very important role in promoting economic growth both locally and nationally. The final report this writing, the autbor would like to know how the planning and design of geometric and hard compact on acces of batubara street in Lahat, so that the road will be able to give a sense of security, convenient, and economical way for the user. In order to design this geometric road, we use some methods, they are Bina Marga’s standard specification method, and Component Analysis Method for planning flexible pavement, and cost plan, and Project Management, and Cross Town Geometric Road Rules ( No.38/TBM,1997 ). From the result od above calculations, so Acces of Batubara street in Lahat is a class I road according to LHR value within >10000 smp/day/ 2 ways with the speed of the road plan 20-60 km/hour, and this road use 28 curves and value of California Bearing Ratio is 3,9% for surface area hard compact thickness are (4cm for ACWC, 6 cm for ACBC, 8 cm for AC base) used asphalt concrete, sub base is 25 cm used split class A and base is 30 cm used agregate class B. This road building was carried out within 116 days with a total fund Rp 24.784.700.000,-
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | This road building was carried out within 116 days with a total fund Rp 24.784.700.000,- |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering > Undergraduate Theses |
Depositing User: | Mr Bambang Anthony |
Date Deposited: | 01 Dec 2015 01:53 |
Last Modified: | 01 Dec 2015 01:53 |
URI: | http://eprints.polsri.ac.id/id/eprint/1323 |
Actions (login required)
![]() |
View Item |