PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN LENTUR PADA JALAN SEMBAWA – SUKAJADI STA 0+000 – STA 5+804 PROVINSI SUMATERA SELATAN

ANGGRAINI, DIAN and SUKMA, MESSA OKTAVIA (2016) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN LENTUR PADA JALAN SEMBAWA – SUKAJADI STA 0+000 – STA 5+804 PROVINSI SUMATERA SELATAN. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.

[img]
Preview
Text
Cover.pdf

Download (497kB) | Preview
[img]
Preview
Text
BAB I - Pendahuluan.pdf

Download (148kB) | Preview
[img]
Preview
Text
BAB II - Tinjauan Pustaka.pdf

Download (1MB) | Preview
[img] Text
BAB III - Perhitungan Geometrik & Tebal Perkerasan.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
BAB IV - Manajemen Proyek.pdf
Restricted to Repository staff only

Download (1MB)
[img]
Preview
Text
BAB V - Penutup.pdf

Download (78kB) | Preview
[img]
Preview
Text
Daftar Pustaka.pdf

Download (126kB) | Preview

Abstract

The Final Report is the geometric design and construction of the Sembawa – Sukajadi road South Sumatera Province. This road has an important role in promoting economic growth either. In writing this final report, the authors wanted to know how the methods of planning and bold geometric pavement both on the Sembawa – Sukajadi South Sumatera Province, so as to give a sense of security, convenient, and economical for road users. In planning this road planning design writer based class of existing roads, the classification level of local roads, traffic loads, soil data as a supporter, and a contour map data area. From the result of calculations, then the Sembawa – Sukajadi South Sumatera Province a second class road with a design speed of 60 km/h, and using 4 pieces bend consists of corner 1 Full Circle, 2 Spiral Circle Spiral, and 1 Spiral Spiral. With thick surface layer AC-WC with 5 cm thick, AC-BC with 7 cm thick, AC-Base with 9 cm thick, to base course on using class A broken stone with 15 cm thick, and subbase using the class B broken stone 15 cm thick. Based on calculations obtained budget plan Rp. 47.969.863.000,00 (Forty Seven Billion Nine Hundred Sixty Nine Million Eight Hundred Sixty Three Thousand) and time of execution of 127 working days.

Item Type: Thesis (Other)
Uncontrolled Keywords: Alinyemen Horizontal, Alinyemen Vertikal, Tebal Perkerasan, Rencana anggaran biaya
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 05 Apr 2017 02:01
Last Modified: 05 Apr 2017 02:01
URI: http://eprints.polsri.ac.id/id/eprint/3376

Actions (login required)

View Item View Item