RAHMADIA, ANNISYA and YUNISA, OKKA (2016) PERENCANAAN JARINGAN IRIGASI SIRING AGUNG SELUAS 368,72 HA KABUPATEN EMPAT LAWANG PROVINSI SUMATERA SELATAN. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.
|
Text
cover.pdf Download (305kB) | Preview |
|
|
Text
BAB 1.pdf Download (145kB) | Preview |
|
|
Text
BAB II.pdf Download (1MB) | Preview |
|
![]() |
Text (BAB III Perhitungan)
BAB III.pdf Restricted to Repository staff only Download (1MB) |
|
![]() |
Text (BAB IV Pengelolaan Proyek)
BAB IV.pdf Restricted to Repository staff only Download (1MB) |
|
|
Text
BAB V.pdf Download (130kB) | Preview |
|
|
Text
DAFTAR PUSTAKA.pdf Download (84kB) | Preview |
|
|
Text
1.pdf Download (533kB) | Preview |
|
|
Text
2.pdf Download (479kB) | Preview |
|
|
Text
3.pdf Download (490kB) | Preview |
|
|
Text
4.pdf Download (497kB) | Preview |
|
|
Text
5.pdf Download (468kB) | Preview |
|
|
Text
8.pdf Download (460kB) | Preview |
|
|
Text
9.pdf Download (446kB) | Preview |
|
|
Text
LONG SECTION BSA editttt-Model.pdf 6.pdf Download (454kB) | Preview |
|
|
Text
LONG SECTION BSA editttt-Model.pdf 7.pdf Download (472kB) | Preview |
Abstract
This final report contains the Design of Siring Agung Irrigation System with measure 368,72 Ha in Empat Lawang District, South Sumatera Province. This report discusses the planning and calculation of channel dimensions both primary and secondary. The data plan for the writing of the final report includes a situation map data, rainfall data, and climatological data (air temperature data of air humidity, wind speed data, and the data of solar radiation). To account for the precipitation used algebraic methods, while for calculating evapotranspiration, analysis cropping pattern and water requirements using the Pen Man. From the calculation results obtained cropping water needs for the region is 1,746 l/det/Ha for an area of 536.465 ha, earlier than planned area is 368.72 Ha. Also obtained trapezoidal dimensions primary channels along the 474, 733 m which b = 1,40 m; h = 0,69 m; V = 0,45 m/det; I = 0,0004993 m. secondary channel along 2427,38 m which b = 0,30-1,25 m; h = 0,27-0,63 m; V = 0,24-0,45 m/det; I = 0,0006029 – 0,0005753 m. This project requires funding budget of Rp 6.702.422.728,68,- the time during 244 days labor jobs.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Irigasi, Siring Agung, Metode Pen Man |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 26 Jul 2017 04:06 |
Last Modified: | 26 Jul 2017 04:06 |
URI: | http://eprints.polsri.ac.id/id/eprint/3773 |
Actions (login required)
![]() |
View Item |