PERANCANGAN JALAN RAYA KAYUAGUNG – SP 1 PEDAMARAN TIMUR STA 22+200 – 29-533 KABUPATEN OGAN KOMERING ILIR PROVINSI SUMATERA SELATAN

Romanzelly, Rizki and Aldriansyah, M. Fiqri (2019) PERANCANGAN JALAN RAYA KAYUAGUNG – SP 1 PEDAMARAN TIMUR STA 22+200 – 29-533 KABUPATEN OGAN KOMERING ILIR PROVINSI SUMATERA SELATAN. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.

[img]
Preview
Text (COVER)
File I.pdf

Download (836kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
File II.pdf

Download (398kB) | Preview
[img]
Preview
Text (BAB II LANDASAN TEORI)
File III.pdf

Download (1MB) | Preview
[img] Text (BAB III PERHITUNGAN KONSTRUKSI)
File IV.pdf
Restricted to Repository staff only

Download (2MB) | Request a copy
[img] Text (BAB IV MANAJEMEN PROYEK)
File V.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img]
Preview
Text (BAB V PENUTUP)
File VI.pdf

Download (290kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
File VII.pdf

Download (103kB) | Preview
[img]
Preview
Text
JURNAL.pdf

Download (1MB) | Preview

Abstract

Road construction is a very important requirement as the main supporter of economis activity both at central and regional levels. One is the area of reed Kurup – Batu Kuning because these two areas are potensial areas for agribusiness and argo-industries, in the making off final project, the writer wants to know how good planning inthe the planning and design of geometric and pavement thickness on road Kayuagung – SP1 Pedamaran Timur STA 22+200 – STA 29+532, so the path to be traversed can provide safety, comfort, and economical for road users. In the geometric design of highway planning, things are reference in planning include the calculation of horizontal alignment, vertical alingment, and define what to use pavement. From the design of highway Kayuagung – SP1 Pedamaran Timur STA 22+200 – STA 29+532 on Ogan Komering Ilir South Sumatera, the type of road is two lane without median and two-way street. The road is classified in Collector class I with the ablity to accommodate 12.228 SMP/day and speed of plan 60 km/h, with 8 corner consist of 4 full circle, and 4 spiral-cicle-spiral. For rigid pavement using pavement with quality of K-350 and 28.5 cm thickness, while concrete floor work thickness is 10 cm and subbase layer using the aggregate class A with thick layer of 15 cm, construction of road is carried out within 341 working days with a total fund of Rp 70.044.061.000,00, (Seventy Billion Fourty Four Million and Sixty one Thousand Rupiahs)

Item Type: Thesis (Other)
Uncontrolled Keywords: Perancangan Jalan Raya, Geometrik, Tebal Perkerasan
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mr Bambang Anthony
Date Deposited: 17 Jan 2020 02:22
Last Modified: 17 Jan 2020 02:22
URI: http://eprints.polsri.ac.id/id/eprint/6405

Actions (login required)

View Item View Item