PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN DI JALAN KOTA WAY – TANJUNG DURIAN – TANJUNG JAYA DAN DANAU JAYA KABUPATEN OKU SELATAN PROVINSI SUMATERA SELATAN STA 6+000 − STA 11+400

Furqon, Ahmad and Wijaya, Suhartono (2013) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN DI JALAN KOTA WAY – TANJUNG DURIAN – TANJUNG JAYA DAN DANAU JAYA KABUPATEN OKU SELATAN PROVINSI SUMATERA SELATAN STA 6+000 − STA 11+400. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (Cover)
Cover LA.pdf

Download (570kB) | Preview
[img]
Preview
Text (Bab I Pendahuluan)
BAB I.pdf

Download (69kB) | Preview
[img]
Preview
Text (Bab II Tinjauan Pustaka)
BAB II.pdf

Download (656kB) | Preview
[img] Text (Bab III Perencanaan)
BAB III.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (Bab IV Pembahasan)
BAB IV.pdf
Restricted to Repository staff only

Download (1MB)
[img]
Preview
Text (Bab V Kesimpulan dan Saran)
BAB IV.pdf

Download (1MB) | Preview
[img]
Preview
Text (Daftar Pustaka)
Daftar Pustaka.pdf

Download (44kB) | Preview

Abstract

ABSTRACT DESIGN OF GEOMETRIC AND HARD COMPACT OF PAGAR ALAM – TANJUNG SAKTI – BATAS BENGKULU STREET PROVINCE OF SOUTH SUMATERA STA 30+000 – STA 35+250 Pagar Alam – Tanjung Sakti – Batas Bengkulu street is a road that connects the west and cross the middle Sumatera, this road has a very important role in promoting economic growth both locally and nationally. The final report this writing, the author would like to know how the planning and design of geometric and hard compact on Pagar Alam – Tanjung Sakti - Batas Bengkulu street, so that the road will be able to give a sense of security, convenient, and economical way for the user. In the planning design of geometric road, things become a reference in planning include the horizontal alinyemen calculation, vertical alinyemen, hard compact and define what that will be used. From the results of above calculations, so Pagar Alam – Tanjung Sakti – Batas Bengkulu street is a class II A road with the speed of the road plan 40 km/hour, and this road used 29 curves. For surface area hard compact thickness is 10 cm used asphalt concrete, sub base is 25 cm used split class A and base is 46,5 cm used sirtu class A. This road building was carried out within 107 days with a total fund Rp 19.843.992.000,00

Item Type: Thesis (Other)
Uncontrolled Keywords: Perhitungan alinyemen horizontal, alinyemen vertikal, serta menetapkan perkerasan apa yang akan digunakan.
Subjects: T Technology > TH Building construction
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 21 Aug 2015 02:13
Last Modified: 21 Aug 2015 02:13
URI: http://eprints.polsri.ac.id/id/eprint/112

Actions (login required)

View Item View Item