PERENCANAAN GEOMETRIK DAN KONSTRUKSI PERKERASAN RUAS JALAN PAGAR ALAM – TANJUNG SAKTI STA 17+000 – STA 22+050

Antioniza, Novin and Darmawan, Edo (2014) PERENCANAAN GEOMETRIK DAN KONSTRUKSI PERKERASAN RUAS JALAN PAGAR ALAM – TANJUNG SAKTI STA 17+000 – STA 22+050. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
Caper.pdf

Download (194kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB 1.pdf

Download (20kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB 2.pdf

Download (1MB) | Preview
[img] Text (BAB III PERHITUNGAN GEOMETRIK DAN PERKERASAN)
BAB 3.pdf
Restricted to Repository staff only

Download (2MB)
[img] Text (BAB IV MANAJEMEN PROYEK)
BAB 4.pdf
Restricted to Repository staff only

Download (1MB)
[img]
Preview
Text (BAB V PENUTUP)
BAB 5.pdf

Download (207kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
Daftar Pustaka.pdf

Download (87kB) | Preview

Abstract

DESIGN OF GEOMETRIC AND CONSTRUCTION PAVEMENT ROAD OF PAGAR ALAM – TANJUNG SAKTI STA 17+000 – STA 22+050 Road construction is a vital necessity as the main supporter of economic activity both at central and regional levels. One is the area of Pagar Alam – Tanjung Sakti because both areas are potential areas for agribusiness and agroindustries. The final report this writing, the author would like to know how the planning and design of geometric and consrtuction pavement on The Road Pagar Alam – Tanjung Sakti STA 17+000 - STA 22+000, so thatthe road will be able to give a sense of security, convenient, and economical way for the user. In the planning design of geometric road, things become a reference in planning include the horizontal alignment calculation, vertical alignment, hard compact and define what that will be used. From the results of above calculations, so The Road TalangBuluh Pagar Alam – Tanjung Sakti II A road with the speed of the road plan 60 km/hour, and this road used 10 curves including 4 Full Circle, 3 Spiral-Spiral and 3 Spiral Circle Spiral. For surfacearea hard compact thickness is 4 cm used asphalt concrete, sub base is 15 cm used split class A and base is 18 cm used sirtu class B. This road building was carried out within 131 days with a total fund IDR. 31.005.900.000,-

Item Type: Thesis (Other)
Uncontrolled Keywords: In the planning design of geometric road, things become a reference in planning include the horizontal alignment calculation, vertical alignment, hard compact and define what that will be used
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 02 Dec 2015 03:16
Last Modified: 02 Dec 2015 03:16
URI: http://eprints.polsri.ac.id/id/eprint/1288

Actions (login required)

View Item View Item