PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN BATAS KOTA SEKAYU – MANGUNJAYA STA 31+850– STA 40+250 PROVINSI SUMATERA SELATAN

AFIFAH, HANA and MUZDALIFAH, RIZKY (2014) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN BATAS KOTA SEKAYU – MANGUNJAYA STA 31+850– STA 40+250 PROVINSI SUMATERA SELATAN. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (Cover)
COVER.pdf

Download (149kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I.pdf

Download (20kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II.pdf

Download (2MB) | Preview
[img] Text (BAB III PERHITUNGAN GEOMETRIK DAN TEBAL PERKERASAN)
BAB III.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB IV MANAJEMEN PROYEK)
BAB IV.pdf
Restricted to Repository staff only

Download (472kB)
[img]
Preview
Text (BAB V PENUTUP)
BAB V.pdf

Download (14kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
Daftar Pustaka.pdf

Download (9kB) | Preview

Abstract

Road boundary Sekayu City - Mangunjaya a road located in the district of Banyuasin, South Sumatera Province. In this thesis, the authors do a good re-planning how to plan a geometric design, flexible pavement construction, road grade, and the calculation of the budget on roads Sekayu City Limits - Mangunjaya so the road to be traversed can provide comfort and security as well as economical for road users. In highway geometric design plan, things become a reference in planning include the calculation of horizontal alignment, vertical alignment, road class and specifies the type of pavement used. From the calculation of the path Sekayu City Limits - Mangunjaya is the class I with a speed plan 60 km/hour, there is a 2 lane road 2 lanes with a width of 2 x 3.5 m and 2 m wide road shoulder. This road section is designed to use 11 pieces bend consisting of 7 pieces bend Spiral Spiral Circle, 2 pieces bend Full Circle and Spiral Spiral 2 corner pieces with each pavement thickness using AC-WC Varley with a 7 cm thick, Varley AC-BC with 8 cm thick, Varley AC-Base with 10 cm thick, layers of foundation on using the aggregate class A with a 25 cm thick layer of aggregate subbase using class B with a thickness of 33 cm. Construction of roads is carried out within 185 days of work at a total cost of Rp. 106 887 400 000, - (Six Hundred Billion Eight Hundred Eighty Seven Million Four Hundred Thousand Rupiah). Keywords: Planning geometric, pavement, Box culvert, RAB

Item Type: Thesis (Other)
Uncontrolled Keywords: Planning geometric, pavement, Box culvert, RAB
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mr Bambang Anthony
Date Deposited: 02 Dec 2015 03:07
Last Modified: 02 Dec 2015 03:07
URI: http://eprints.polsri.ac.id/id/eprint/1302

Actions (login required)

View Item View Item