PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN PADA PROYEK RUAS JALAN MAYJEN SATIBI DARWIS – TRANSMIGRASI RAMBUTAN KOTA PALEMBANG PROVINSI SUMATERA SELATAN STA 0+000 – 5+000

Safitri, Maya and Sari, Santi Riana (2014) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN JALAN PADA PROYEK RUAS JALAN MAYJEN SATIBI DARWIS – TRANSMIGRASI RAMBUTAN KOTA PALEMBANG PROVINSI SUMATERA SELATAN STA 0+000 – 5+000. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
COVER LA.pdf

Download (435kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB I LA.pdf

Download (177kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB II LA.pdf

Download (614kB) | Preview
[img] Text (BAB III PERHITUNGAN GEOMETRIK DAN TEBAL PERKERASAN)
BAB III LA.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB IV MANAJEMEN PROYEK)
BAB IV LA.pdf
Restricted to Repository staff only

Download (726kB)
[img]
Preview
Text (BAB V PENUTUP)
BAB V LA.pdf

Download (153kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (4kB) | Preview

Abstract

Mayjen Satibi Darwis – Transmigrasi Rambutan Road Palembang City, South Sumatera Province is a one of infrastructure of land transportation that its existence is necessary for transport smoothly and economic growth in Palembang City. In the writing of this Final Report, the authors wanted to know how good to planning geometric design and flexible pavement thickness on Mayjen Satibi Darwis – Transmigrasi Rambutan Road Palembang City, South Sumatera Province, so the path to be traversed can provide a sense of security, convenient for road users at an economical cost. In the geometric planning of the highway plan, there are things that the reference in the plan include the calculation of horizontal alignment, vertical alignment, and to determine what to use pavement. From the above calculation calculation, Mayjen Satibi Darwis – Transmigrasi Rambutan Road Palembang City, South Sumatera Province is an collector road with a class II with speed planning 60 km/h, and on the street corners using 6 pieces. Layer of the road surface using Laston with 10 cm thick, layer of crushed stone foundation using class A with a 25 cm thick, while the bottom layer using a gravel foundation class B with 58 cm thick. Construction of roads is carried out within 110 days with a total fund of Rp.26.827.143.800,00. Keywords : Planning, Geometric, Road

Item Type: Thesis (Other)
Uncontrolled Keywords: Planning, Geometric, Road
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 01 Dec 2015 01:45
Last Modified: 01 Dec 2015 01:45
URI: http://eprints.polsri.ac.id/id/eprint/1337

Actions (login required)

View Item View Item