PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN KAKU JALAN GUMAWANG – KURUNGAN NYAWA KABUPATEN OKU TIMUR PROVINSI SUMATERA SELATAN STA 0+000 – 8+241

Luntungan, Jexi Imanuel and Furqon, Ahmad (2015) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN KAKU JALAN GUMAWANG – KURUNGAN NYAWA KABUPATEN OKU TIMUR PROVINSI SUMATERA SELATAN STA 0+000 – 8+241. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
Cover.pdf

Download (625kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB 1 PDF.pdf

Download (68kB) | Preview
[img]
Preview
Text (BAB II LANDASAN TEORI)
BAB 2 PDF.pdf

Download (1MB) | Preview
[img] Text (BAB III PERHITUNGAN GEOMETRIK DAN PERKERASAN)
BAB 3 PDF.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB IV MANAJEMEN PROYEK)
BAB 4 PDF.pdf
Restricted to Repository staff only

Download (1MB)
[img]
Preview
Text (BAB V PENUTUP)
BAB 5 PDF.pdf

Download (67kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
Daftar Pustaka.pdf

Download (8kB) | Preview

Abstract

Road construction is a very important rewuirement as the main supporter of economis activity both at central and regional levels. One is the area of reed Gumawang – Kurungan Nyawa because these two areas are potensial areas for agribusiness and argo-industries, in the making off thesis, the writer wants to know how good planning inthe the planning and design of geometric rigid pavement thickness on road Gumawang – Kurungan Nyawa STA 0+000 – STA 8+241, so the path to be traversed can provide safety, comfort, and economical for road users. In the geometric design of highway planning, things are reference in planning include the calculation of horizontal alignment, vertical alingment, and define what to use pavement. From the result of the calculations above, the road Gumawang – Kurungan Nyawa is a road with speed class II A street plan of 60 km/h, an in this way using 15 pieces including 2 corners spiral-spiral, 2 ful circle, dan 3 spiral-circle-spiral., For rigid pavement using pavement with quality of K-350 and 22 cm thick, while the for quality concrete floor work using the K-175 with a thickness of 10 cm and subbase layer using the aggregate class B with a thick layer of 15 cm, construction of roads is carried out within 218 working days with a total fund of Rp 52.946.000.000 (Fifty Two Billion Nine Hundred Forty Six Million Rupiahs). Key word : The road, geometric design, thickness of rigid pavement.

Item Type: Thesis (Other)
Uncontrolled Keywords: The road, geometric design, thickness of rigid pavement.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 18 Nov 2015 08:52
Last Modified: 18 Nov 2015 08:52
URI: http://eprints.polsri.ac.id/id/eprint/1514

Actions (login required)

View Item View Item