PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN LENTUR PADA RUAS JALAN BATAS KOTA PALEMBANG – TANJUNG API-API STA 27+000 – STA 33+512,2 PROVINSI SUMATERA SELATAN

Mizdalifah, Tiara and Utari, Wahdiah Zunda (2015) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN LENTUR PADA RUAS JALAN BATAS KOTA PALEMBANG – TANJUNG API-API STA 27+000 – STA 33+512,2 PROVINSI SUMATERA SELATAN. Other thesis, Politeknik Negeri Sriwijaya.

[img]
Preview
Text (COVER)
COVER.pdf

Download (418kB) | Preview
[img]
Preview
Text (BAB I PENDAHULUAN)
BAB+I.pdf

Download (363kB) | Preview
[img]
Preview
Text (BAB II TINJAUAN PUSTAKA)
BAB+II.pdf

Download (2MB) | Preview
[img] Text (BAB III PERHITUNGAN GEOMETRIK DAN TEBAL PERKERASAN)
BAB+III.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB IV MANAJEMEN PROYEK)
BAB+IV.pdf
Restricted to Repository staff only

Download (1MB)
[img]
Preview
Text (BAB V PENUTUP)
BAB+V.pdf

Download (264kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR+PUSTAKA.pdf

Download (6kB) | Preview

Abstract

This final report is about the geometric and construction pavement of palembang city limit – tanjung api-api road STA STA 27+000 – STA 33+512,2 south sumatra province. The writer design the planning based on the level of avenue, classification level of area and traffic load. Satitistic result from LHR is 49.575,752 smp, this avenue categorized in class I A (arteri avenue) based on RSNI geometric avenue in 2004, which have 4 curve consists of 2 curve full circle, and 2 curve spiral circle spiral. Based on total number of vehicles which throught the road, pavement planned for this avenue consists of its cover AC W is 4 cm, AC BC 8cm, AC base 18 cm, upper foundation (CBR 90%) 14 cm, while bottom foundation using sirtus class B (CBR 60%) 20 cm. In the upper of AC WC, AC BC and AC base using hard and soft aggregates, asphalt and filler either for upper and bottom foundation. Based on the calculation data, the cost for tanjung api-api road – palembang city limit spent, Rp.69.497.501.000,00 (sixty-nine billion, four hundred and ninety seven million five hundred and one thousand rupiah) Keywords : geometric, LHR, curve, pavement, RAB

Item Type: Thesis (Other)
Uncontrolled Keywords: geometric, LHR, curve, pavement, RAB
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 25 Nov 2015 01:41
Last Modified: 25 Nov 2015 01:41
URI: http://eprints.polsri.ac.id/id/eprint/1545

Actions (login required)

View Item View Item