PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN LENTUR PADA JALAN MUARA ENIM – SUBAN JERIJI – LECAH STA 0 + 000 – STA 6 + 000 KABUPATEN MUARA ENIM PROVINSI SUMATERA SELATAN

AL BAIS, DWI RAFIKA and RIPAN, RISKI (2016) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN LENTUR PADA JALAN MUARA ENIM – SUBAN JERIJI – LECAH STA 0 + 000 – STA 6 + 000 KABUPATEN MUARA ENIM PROVINSI SUMATERA SELATAN. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.

[img]
Preview
Text (Cover)
COVER.pdf

Download (485kB) | Preview
[img]
Preview
Text (BAB I Pendahuluan)
BAB I.pdf

Download (198kB) | Preview
[img]
Preview
Text (BAB II Tinjauan Pustaka)
BAB II.pdf

Download (2MB) | Preview
[img] Text (BAB III Pembahasan)
BAB III.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB IV Manajemen Proyek)
BAB IV.pdf
Restricted to Repository staff only

Download (3MB)
[img]
Preview
Text (BAB V Penutup)
BAB V.pdf

Download (181kB) | Preview
[img]
Preview
Text
Daftar Pustaka.pdf

Download (64kB) | Preview
[img] Other (Lampiran)
KURVA S FIX.xls

Download (217kB)
[img]
Preview
Text (RTC)
Lampiran.pdf

Download (2MB) | Preview

Abstract

Seeing the development of traffic is significant, the incidence of traffic jams due to damaged roads and endangering road users. For that we need a good transportation then made way Muara Enim – Suban Jeriji – Lecah, with planning that considers the safety and comfort of road users. As an alternative to cope with rising capacity road users, then the implementation of the project is expected economic activity Muara Enim – Suban Jeriji – Lecah and vicinity can reduce congestion, reduce accidents, and improve the economy, education and can improve people's lives. In writing this final report, the authors conducted a redesign of how good planning geometric design, flexible pavement construction, road grade, and the calculation of the budget on road Muara Enim – Suban Jeriji – Lecah. In the planning of geometric design street, the guidance there are teh calculation alinyemen horizontal, alinyemen vertical, classify of street and what the harden was used. Based on the calculation above, found that Muara Enim – Suban Jeriji – Lecah was Colector type road in classify II with the planning speed 60 km/jam, there are 2 band 2 coloumn where the width of street 2x3,5 m and the width of street shoulder 2 m. In this street was use 8 curve. And the developing this street was done in 169 days with the total cost Rp 96.715.508.500,00 (Ninety Six billion Seven Hundred Fifteen Million Five Hundred and Eight Thousand Five Hundred Rupiah)

Item Type: Thesis (Other)
Uncontrolled Keywords: use 8 curve, 169 days
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 30 Mar 2017 02:17
Last Modified: 30 Mar 2017 02:17
URI: http://eprints.polsri.ac.id/id/eprint/3368

Actions (login required)

View Item View Item