PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN LENTURRUAS JALAN AKSES KAWASAN EKONOMI KHUSUS (KEK) STA 00+000 – STA 05+260 KABUPATEN BANYUASIN PROVINSI SUMATERA SELATAN

ISLAN, KHOIRUNNISAK FEBRILLIA and VERLIZA, ANDRENA (2016) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN LENTURRUAS JALAN AKSES KAWASAN EKONOMI KHUSUS (KEK) STA 00+000 – STA 05+260 KABUPATEN BANYUASIN PROVINSI SUMATERA SELATAN. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.

[img]
Preview
Text
COVER.pdf

Download (490kB) | Preview
[img]
Preview
Text (BAB I Pendahuluan)
BAB 1.pdf

Download (114kB) | Preview
[img]
Preview
Text (BAB II Tinjauan Pustaka)
BAB 2.pdf

Download (1MB) | Preview
[img] Text (BAB III Pembahasan)
BAB 3.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text (BAB IV Manajemen Proyek)
BAB 4.pdf
Restricted to Repository staff only

Download (1MB)
[img]
Preview
Other (BAB V Penutup)
Bab 5.PDF

Download (150kB) | Preview
[img]
Preview
Text
Daftar pustaka.pdf

Download (8kB) | Preview
[img]
Preview
Text
Lampiran.pdf

Download (6MB) | Preview

Abstract

The final report is about geometric design and flexible pavement thickness on road Kawasan Ekonomi Khusus (KEK) STA 00+000 – STA 05+260 Banyuasin District South Sumatera Province. This road segment has an important things to improve the welfare of the people in all fields. In this final report, to planning this roads the authors design based class of existing roads, the clastification level of local roads, traffic loads, soil data as a suppoter, and a countour map data area, and also the things that become a reference in planning involve the calculation horizontal alignment, alignment vertikal, classify of road and set a pavement will be used. Based on the calculation that Kawasan Ekonomi Khusus (Kek) was in classify I with the planning speed 80 km/ h, there are 2 lane 2 way, with width of street 2 x 3,5 and the witdth of roadside 2 meters and using six pieces bend consisst of corner 2 Full Circle, 1 Spiral Circle Spiral and 3 spiral – spiral with thick surface layer Ac-Wc with 7 cm thick, Ac-Bc with 8 cm thick, Ac-Base with 12 cm thick. Based on the calculation obtained budget plan Rp.Rp. 48.817.074.000(fourty eight billion eight hundred seventeen million seventy four thousand rupiah) and time of execution of 172/146 working days.

Item Type: Thesis (Other)
Uncontrolled Keywords: Alinyemen Horizontal, Alinyemen Vertikal, Tebal Perkerasan, Rencana Anggaran Biaya
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 11 Apr 2017 03:32
Last Modified: 11 Apr 2017 03:32
URI: http://eprints.polsri.ac.id/id/eprint/3385

Actions (login required)

View Item View Item