ANALISA MCB 2 AMPERE PADA KWH METER 30 RUMAH DI DESA JAMBAT BALO KEC. PAGARALAM SELATAN KOTA PAGARALAM

RUSLIANSYAH, HENGKI (2016) ANALISA MCB 2 AMPERE PADA KWH METER 30 RUMAH DI DESA JAMBAT BALO KEC. PAGARALAM SELATAN KOTA PAGARALAM. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.

[img]
Preview
Text (Cover)
File I.pdf

Download (347kB) | Preview
[img]
Preview
Text (BAB I Pendahuluan)
File II.pdf

Download (264kB) | Preview
[img]
Preview
Text (BAB II Tinjauan Pustaka)
File III.pdf

Download (1MB) | Preview
[img] Text (BAB III Metodologi Penelitian)
File IV.pdf
Restricted to Repository staff only

Download (296kB)
[img] Text (BAB IV Pembahasan)
File V.pdf
Restricted to Repository staff only

Download (311kB)
[img]
Preview
Text
File VI.pdf

Download (214kB) | Preview
[img]
Preview
Text
File VII.pdf

Download (116kB) | Preview
[img]
Preview
Text (Dokumentasi (Foto))
Lampiran.pdf

Download (245kB) | Preview

Abstract

MCB 2 Ampere has a capacity of 450 KWH meters installed in 30 houses in the village south of the city jambat kec.pagaralam Pagaralam balo is not in accordance with the capacity of which is owned, because the real cause of the MCB is the use of current that exceeds the nominal current of MCB and most other causes in houses that use electronic equipment has begun to age, as we use the old tube TV when turned on using the initial current is sufficiently large to MCB Trip. Then the thing to do is when powering electronic equipment that has been aged should subtract another burden that MCB does not trip.

Item Type: Thesis (Other)
Uncontrolled Keywords: MCB, Arus Nominal, Trip
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Electrical Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 31 Jul 2017 05:36
Last Modified: 31 Jul 2017 05:36
URI: http://eprints.polsri.ac.id/id/eprint/3814

Actions (login required)

View Item View Item