GANTARA, M. MR. RAMA DWI (2016) PERENCANAAN STRUKTUR BANGUNAN GEDUNG STASIUN PENGENDALIAN OPERASI PT. PERTAGAS DI CIKARANG PROVINSI JAWA BARAT. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.
|
Text
1.COVER - DAFTAR TABEL ASENK FIX.pdf Download (525kB) | Preview |
|
|
Text
2.BAB 1 Rama.pdf Download (212kB) | Preview |
|
|
Text
3.BAB II LA RAMA.pdf Download (1MB) | Preview |
|
![]() |
Text (BAB III Perhitungan Konstruksi)
BAB III (1).pdf Restricted to Repository staff only Download (853kB) |
|
![]() |
Text
BAB III (2).pdf Restricted to Repository staff only Download (485kB) |
|
![]() |
Text
BAB III (3).pdf Restricted to Repository staff only Download (1MB) |
|
![]() |
Text
BAB III (4).pdf Restricted to Repository staff only Download (658kB) |
|
![]() |
Text
BAB III (5).pdf Restricted to Repository staff only Download (460kB) |
|
![]() |
Text
BAB III (6).pdf Restricted to Repository staff only Download (943kB) |
|
![]() |
Text
BAB III (7).pdf Restricted to Repository staff only Download (734kB) |
|
![]() |
Text
BAB III (8).pdf Restricted to Repository staff only Download (587kB) |
|
![]() |
Text
BAB III (9).pdf Restricted to Repository staff only Download (482kB) |
|
![]() |
Text
BAB III (10).pdf Restricted to Repository staff only Download (645kB) |
|
![]() |
Text
BAB III.pdf Restricted to Repository staff only Download (7MB) |
|
![]() |
Text (BAB IV Pengelolaan Proyek)
BAB IV RKS FIX.pdf Restricted to Repository staff only Download (262kB) |
|
|
Text
BAB V.pdf Download (9kB) | Preview |
|
|
Text
DAFTAR PUSTAKA.pdf Download (6kB) | Preview |
|
|
Text
REKAP DAN KURVA S FIX.pdf Download (204kB) | Preview |
|
![]() |
Slideshow
PPT RAMA.pptx Download (493kB) |
Abstract
Population growth makes it increasingly dense population in the city of Palembang. And in establishing a sense of humanity and mutual help among fellow social beings, necessary for building social humanity to help if there is something of a disaster or other matters between the increasingly dense population. Thus it is planned construction of Building Integrated Palang Merah Indonesia is to make it happen.In the wole builing is part of the building using reinforced concrete structures and using footprint foundation as the structure of the bottom of the building. The building is based on SNI 2847-2013 as a theoretical basis, and the rate of imposition Indonesia to hall 1983. we also use several other books such as Reinforced Concrete Structures Istimawan Dipohusodo essay, and written by Gideon Basic of Planning Reinforced Concrete. From the results of the planning for Integrated Building Control Stasion Operating In the province of west java cikarang which consist of 3 floors, is used dimension of the column 35 x 35 cm2, 45 x45 cm2 with diameter reinforcement 19 mm, dimension beams 20 x 40 cm2, 35 x 50 cm2, with diameter reinforcement 19 mm, thickness of plates 12 cm in diameter reinforcement of 8 mm, and the depth of foundation 12 meters. Based onthe calculations can be concluded that this structure is stable and safe. And for the implementatiton of this development spend Rp 7.041.101.375,09
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Struktur, Dimensi, Beton, Penulangan, Manajemen |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Civil Engineering > Undergraduate Theses |
Depositing User: | Mrs Trisni Handayani |
Date Deposited: | 13 Oct 2017 01:34 |
Last Modified: | 13 Oct 2017 01:34 |
URI: | http://eprints.polsri.ac.id/id/eprint/4128 |
Actions (login required)
![]() |
View Item |