PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN KAKU PADA RUAS JALAN SEI LILIN – PENINGGALAN PROVINSI SUMATERA SELATAN STA 12+000 – STA 17+000

NURDIN, ALIMIN and MUHAMMAD, TAUFAN (2017) PERENCANAAN GEOMETRIK DAN TEBAL PERKERASAN KAKU PADA RUAS JALAN SEI LILIN – PENINGGALAN PROVINSI SUMATERA SELATAN STA 12+000 – STA 17+000. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.

[img]
Preview
Text (Cover)
File 1.pdf

Download (1MB) | Preview
[img]
Preview
Text (BAB I Pendahuluan)
file 2.pdf

Download (196kB) | Preview
[img]
Preview
Text (BAB II Tinjauan Pustaka)
file 3.pdf

Download (2MB) | Preview
[img] Text (BAB III Perhitungan Konstruksi)
file 4.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] Text (BAB IV Manajemen Proyek)
file 5.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img]
Preview
Text (BAB V Penutup)
file 6.pdf

Download (253kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
file 7.pdf

Download (179kB) | Preview

Abstract

This final project is planning a geometric design and rigid pavement on roads Sei. Lilin – Peninggalan, South Sumatera in sta. 12 + 000 to sta. 17 + 000. The road construction is a very important requirement as the main supporter of economic activity in both the central and regional levels. One of them is the area Sei. Lilin – Peninggalan, because these two areas is a potential region as a line of business and industry as well as the road is a causeway linking South Sumatera and Jambi Province. In planning the road Sei. Lilin – Peninggalan authors plan total road length 5 km, width of pavement 7 m and 2 m shoulders on both sides of the road. The planning pavement using rigid pavement with a plate thickness of 20 cm and uses the quality of concrete K-350, as well as using aggregate subbase layer of class B with a thickness of 15 cm. Calculations obtained from ADT24.948,72 smp, so the streets is classified in class I (artery) who holds the value of smp > smp 20,000 based regulation Geometric Planning Highway. This road is planned with eight kinds of road bend, there is 2 Full Circle (FC), 2 Spiral – Spiral (SS), 4 Spiral Circle Spiral (SCS). Based on calculations obtained costs incurred on road planning Sei. Lilin – Peninggalan is Rp.37.774.736.000(Thirty Seven Billion seven hundred seventy four million seven hundred thirty six thousand). The construction of this road implemented within 166 calendar days.

Item Type: Thesis (Other)
Uncontrolled Keywords: Jalan, Desain Geometrik, Tebal perkerasan kaku
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Design Roads and Bridges > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 19 Oct 2017 01:23
Last Modified: 19 Oct 2017 01:23
URI: http://eprints.polsri.ac.id/id/eprint/4152

Actions (login required)

View Item View Item