PERENCANAAN BANGUNAN GEDUNG TEORI SMK NEGERI 2 PALEMBANG

-, TANSILAH and TRIASTUTI, WIDIA (2016) PERENCANAAN BANGUNAN GEDUNG TEORI SMK NEGERI 2 PALEMBANG. Other thesis, POLITEKNIK NEGERI SRIWIJAYA.

[img]
Preview
Text
COVER.docx.pdf

Download (460kB) | Preview
[img]
Preview
Text (BAB I Pendahuluan)
BAB I.pdf

Download (22kB) | Preview
[img]
Preview
Text (BAB II Tinjauan Pustaka)
BAB II.pdf

Download (2MB) | Preview
[img] Text (BAB III Perhitungan Konstruksi)
BAB III.pdf
Restricted to Repository staff only

Download (2MB)
[img] Text (BAB IV Manajemen Proyek)
BAB IV.pdf
Restricted to Repository staff only

Download (69kB)
[img]
Preview
Text (BAB V Penutup)
BAB V.pdf

Download (18kB) | Preview
[img]
Preview
Text
DAFTAR PUSTAKA.pdf

Download (84kB) | Preview
[img]
Preview
Text
1.pdf

Download (408kB) | Preview
[img]
Preview
Text
2.pdf

Download (410kB) | Preview
[img]
Preview
Text
3.pdf

Download (411kB) | Preview
[img]
Preview
Text
4.pdf

Download (245kB) | Preview
[img]
Preview
Text
5.pdf

Download (218kB) | Preview
[img]
Preview
Text
6.pdf

Download (275kB) | Preview
[img]
Preview
Text
7.pdf

Download (385kB) | Preview
[img]
Preview
Text
8.pdf

Download (173kB) | Preview
[img]
Preview
Text
9.pdf

Download (194kB) | Preview
[img]
Preview
Text
10.pdf

Download (471kB) | Preview
[img]
Preview
Text
11.pdf

Download (480kB) | Preview
[img]
Preview
Text
12.pdf

Download (631kB) | Preview
[img]
Preview
Text
13.pdf

Download (326kB) | Preview
[img]
Preview
Text
14.pdf

Download (405kB) | Preview
[img]
Preview
Text
15.pdf

Download (406kB) | Preview
[img]
Preview
Text
16.pdf

Download (427kB) | Preview
[img]
Preview
Text
17.pdf

Download (399kB) | Preview
[img]
Preview
Text
18.pdf

Download (483kB) | Preview
[img]
Preview
Text
19.pdf

Download (587kB) | Preview
[img]
Preview
Text
20.pdf

Download (591kB) | Preview
[img]
Preview
Text
21.pdf

Download (588kB) | Preview
[img]
Preview
Text
22.pdf

Download (432kB) | Preview
[img]
Preview
Text
23.pdf

Download (356kB) | Preview
[img]
Preview
Text
24.pdf

Download (511kB) | Preview
[img]
Preview
Text
25.pdf

Download (395kB) | Preview
[img]
Preview
Text
26.pdf

Download (416kB) | Preview
[img]
Preview
Text
27.pdf

Download (417kB) | Preview
[img]
Preview
Text
28.pdf

Download (394kB) | Preview
[img]
Preview
Text
29.pdf

Download (374kB) | Preview
[img]
Preview
Text
30.pdf

Download (503kB) | Preview
[img]
Preview
Text
31.pdf

Download (590kB) | Preview
[img]
Preview
Text
32.pdf

Download (546kB) | Preview
[img]
Preview
Text
33.pdf

Download (559kB) | Preview
[img]
Preview
Text
34.pdf

Download (528kB) | Preview
[img]
Preview
Text
35.pdf

Download (436kB) | Preview
[img]
Preview
Text
36.pdf

Download (295kB) | Preview

Abstract

The quality of education is one of supporting factors to improving a country’s development progress in various sectors.The education’s quality in Indonesia has developed include in South Sumatera.So that SMK N 2 Palembang as one of vocational high school in Palembang that getting fund from government to increase the facilities of infrastructure. The title of this final report is The Designing of theory building ofMajored State High School 2 Palembang.This type of building planned that has 770 m2of construction scale in Demang Lebar Daun Street, Palembang. The purpose this study is to make a design of a building which has a function for academic activity.. The author plans and measures this construction based on primary and secondary data. The primary data gathered from planning observation in a field and the secondary data uses formula which analyzed from a few literatures. The base theory measurement uses SNI-03-1729-2002 about Steel Structure, SNI 03-2847-2002 about Concrete Structure, and Reinforced Concrete Structure by Istimawan and Reinforced Concrete Measurement List by Gideon. The final result of this study is using roof steel conventional profile with double L. 50.50.5, concrete structure for beam, floor plate, column, and sloof 300 x 500 mm for horizontal beam dimension and 350 x 700 mm for vertical beam dimension, 400 x 400 mm for column, 300 x 500 mm for sloof and 120 mm for floor plate thick and also we use pile cap foundation with 400 x 400 mm of size, with the deepness about 16,4 m. Base on the measurement, this study concluded that this building construction is stable and safe.

Item Type: Thesis (Other)
Uncontrolled Keywords: Perencanaan, Gedung, Struktur
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Civil Engineering > Undergraduate Theses
Depositing User: Mrs Trisni Handayani
Date Deposited: 04 Apr 2017 02:29
Last Modified: 04 Apr 2017 02:29
URI: http://eprints.polsri.ac.id/id/eprint/3375

Actions (login required)

View Item View Item